London Underground Limited, London, UK     

Project manager for an international joint venture between Grant Lyon Eagre (UK) and Railbouw BV, the Netherlands. The contract involved the development and implementation of track renewal methods in London, firstly starting with the surface and subsurface tracks. After the methods were proven the process was copied to the Deep Tube tunnels.

Project duration over 10 years with a total value over € 200 million and over 650 personnel during peak times.